Donut Charts - Viewing small steps of progress using the donut charts
The level of experience donut chart shows the student’s progress across all the different levels of achievement on a particular level. If you add a second date, it will show the progress, however small, between the two dates. You can also compare two pie charts to show the progress a student has shown over time.
To view the Level Status of a student
- Navigate to the Student Assessment screen in Connecting Steps.
- Select the required Group Type, Group, Student, Framework etc in the Selection panel.
- Click the Level Status icon.
The level of experience for the selected student displays in a pie chart.
To compare the current level pie chart to an earlier one
- Follow steps 1-3 above in To view the level status of a student.
- Click the Side by side comparison icon and the comparison date window opens.
- Select the required date.
Connecting Steps displays the pie charts side by side.
Note: If you do not see the Level Status icon, it could be that no baseline has been set for that subject/profile or that the student is not working on that framework.